Install a fence: key steps with garden screens

The key steps to install a wooden fence with garden screens yourself - from boundary to finish, with a link to the full project guide.

Short answer: The key steps to install a wooden fence with garden screens yourself are: (1) boundary, neighbours, permit and cable check, (2) measure and material list, (3) set and foundation posts, (4) mount screens, (5) check and maintain. Core steps below. Full weekend plan: fence project guide.

Materials: garden screens · Overview: wooden screens and fences · Prices: fence costs.

1. Boundary, neighbours, permit and cables

Confirm the boundary (land registry if unsure). Exactly on the line often needs neighbour consent. Up to ±2 m in the rear garden is often permit-free; check the environment desk. File a cable enquiry before digging. Details: fence project - preparation.

2. Measure and material list

Measure length, choose height and post centres (often ±191 cm for standard screens). List screens, posts, base plates, concrete/gravel, stainless fasteners. Ask for a material calculation or quote.

3. Foundation and setting posts

Mark with a string line. Dig deep enough (often 60–80 cm), gravel base, plumb the post, let concrete cure. This decides whether the fence stays straight. Steps: project - setting posts.

4. Mount garden screens

Hang or screw screens level between posts. Allow expansion/ventilation as specified. Use stainless or outdoor-rated screws. Tips: fence installation tips.

5. Finish and maintenance

Check the top line, post firmness and protruding screws. Treat timber after a few months drying, then periodically. Finish tips: project - finishing.

Need material advice? Call 0522 851 551 or order via the fencing shop.

Frequently asked questions

What are the most important steps to install a wooden fence with garden screens yourself?

Arrange boundary and cables, measure and order materials, set posts deep and plumb, mount screens level, check and maintain. Full plan: fence project guide.

How long does DIY installation take?

For about 10 metres, plan one weekend with two people, plus concrete curing time.

Do I need a permit?

Up to 2 m in the rear garden usually not; front boundaries are stricter. Always check the environment desk or your municipality.

Where is the complete step-by-step guide?

At /project/schutting - this page summarises the essentials for quick orientation.